블로그

[우경건설] 상생 프로젝트 PUS Girder Bridge 실무검증 완성~

MIDAS CIM21. 5. 27 오후 4:30

"안되면 되게 하라~"

 

영국 Connel Bridge의 내하력평가

MIDAS CIM21. 4. 19 오후 8:01

 

강교의 좌굴붕괴 검토

MIDAS CIM21. 4. 19 오후 8:00

Background

 

In 2016, Kolkata witnessed a major steel bridge failure of the Vivekananda Road Flyover during construction which led to 27 deaths and 50 injured. The construction work of a 2.2km flyover began in 2009 and was expected to be completed in 2010. Although six years behind schedule, it was not yet completed the erection part till 2016 (Figure 1).

보도육교의 해외 설계사례 (트러스교)

MIDAS CIM21. 4. 19 오후 7:59

This case study covers the following aspects:

강합성교량의 해석모델링 해외 사례

MIDAS CIM21. 4. 19 오후 7:59

 

강합성교량의 해외 설계사례

MIDAS CIM21. 4. 19 오후 7:58

This webinar shows a case study about the steel composite ladder deck girder bridge. The webinar will highlight major factors to consider in the design of this type of bridge, such as shear lag and buckling effects. It will provide recommendations on suitability and use of different model types. Since many of ladder deck bridges are constructed using the push launch method, special considerations for the construction sequence will be discussed.  

Insight ! 3차원 파라메트릭 기반 교량설계 기술

MIDAS CIM21. 2. 13 오후 4:00

기술기사 공유 " 3차원 파라메트릭 기반 교량설계 기술 "